Test case design
Analysis, design, and documentation of test cases based on the customer’s requirements.
System test cases, system integration test cases, end-to-end test cases, acceptance test cases = ready for test execution.
Kickoff meeting with a presentation of the company, program/project, and organization, project model, as well as identification of stakeholders and background material.
Workshop with stakeholders to review the above in detail, focusing on test maturity, test activities, and the current status of testing.
Workshop for developing a product and (test) project risk analysis (optional, recommended if a risk analysis is not already available).
Analysis of the test strategy, requirements framework – requirement specification, use cases, business processes, design specifications, and solution descriptions.
The development of the test plan includes:
Handover
Contact us by phone at +45 44 979 979, via email at info@testhuset.dk, or through our contact form.
Content